OAKE

Home
Location
Events
Activities
Profile
History
Church

Profile
History
Church

HILLCOMMON

Profile
History

HILLFARRANCE

Profile
Church
Flood Prevention
History
Photos

AMENITIES

School
Pre-school
Post Office
Oake Hall
Recreation
Food & Drink
Where to stay
Transport

COUNCIL

Introduction
Contacts
Agenda
Minutes
Past Minutes

Business Directory
Our website
Links
Photo Gallery

 

 

 

 

 

 

 

 

 

 

Hillfarrance Flood Alleviation Scheme

Sluice Gate on Hillfarrance Brook

Hillfarrance had a history of recurrent flooding.   In 2003 a Flood Alleviation Scheme was constructed at a cost of over £2 million.

A 700-metre long by-pass channel to the north of the village carries flood waters around the village.   This has worked successfully keeping homes dry in Hillfarrance twice during 2004.  In January 2004 water flowed down the channel for 6 hours or so. The village is no longer cut off during flooding.

 

 

The design of the scheme allows a protection of 1 in 200 years or 1 in 100 years plus 20% increase in flows within the freeboard allowance.

 

 

 

 

 

 

 

 

 

The sluice gate by Forde bridge and the building of the bridge in Frog Street

Below is a picture of flooding in January 2008 when heavy rain caused floods on two ocassions, although some roads where flooded no houses in the village had any problems and all the water
went down the flood scheme.


Oake Parish
parishclerk@oake.org.uk

© Oake Parish 2006

disclaimer